FTE'S required
How many FTE's are required for a BPO receiving 100000 call volume in a month (4 Weeks). The average handling time for this BPO is 500 secs. Each advisor is required to give 45 hrs in a week and is entitled for 1 hour daily break. The shrinkage assumptions to be considered here is 15%.